Crucial Developments in 3D Building Services Design and Coordination Field

Building services projects have benefited from many developments that have occurred in the last decade. Whether in the areas of MEP (M&E) systems design, 3D building services coordination, or interdisciplinary collaboration, the major advances seen in this field have emanated both from within the industry as well as from other sources, such as government regulations and economic developments.

·      Intelligent BIM Software for Planning and Design of Projects

One of the biggest changes in the modern building services industry is the use of intelligent building information modelling (BIM) software tools that allow for the creation of accurate and detailed representations of mechanical, electrical, plumbing, and fire protection systems using computable data. The fact that there are BIM tools more intelligent than ever and also which work across disciplines, such as architecture, structural engineering, and building services engineering, increases interdisciplinary coordination and reduces construction waste and rework.

For instance, the BIM models created using Autodesk Revit Architecture and Revit MEP can be used by building service designers for developing concept designs, schematics, and tender drawings. The same parametric model can be worked upon and used by contractors to create detailed installation and 3D MEP (M&E) coordinated drawings, including services-specific as well as multi-service coordinated plans, sections, and elevations. Furthermore, fabricators and installers can use the BIM model in conjunction with FAB MEP, a fabrication tool, to manufacture pre-assembled modules for installation on-site.

Not only does BIM allow creation of a coordinated 3D model, it also allows for information to be added to the model that can be used for project-critical purposes, including schedule creation, cost estimation, energy analysis and facilities management.

·      Greater Interdisciplinary Collaboration

Due to the growing adoption of BIM tools industry-wide complemented by the availability of sophisticated hardware systems and online collaboration channels, there is a far greater degree of interdisciplinary coordination between different stakeholders involved in AEC projects. As a result, architects, structural engineers, MEP consultants, MEP engineers, main contractors (general contractors), cost estimators, and fabricators can seamlessly collaborate during the design and planning stages and avoid costly rework during the construction stages.

For instance, large-scale construction projects generally have a complicated project structure comprising diverse project teams based in different geographical areas. During the pre-construction stage, sharing and interlinking the BIM model prepared by architects, structural engineers, MEP specialists and contractors enables respective designs to stay coordinated. Due to cloud-based collaboration tools, team members can hold review sessions online without having to be physically present together.

·      Higher Degree of Pre-Fabrication and Just-In-Time Delivery for Installation

With the widespread use of parametric modelling techniques in MEP design and planning, a major trend is to use BIM models forpre-fabrication purposes with a view to enhance the logistical cycle on the construction site. When used in conjunction with CNC fabrication applications, such as FAB-MEP, the BIM design data can be used to create fabrication drawings that can be recognised by CNC machines. Such a BIM-led prefabrication can streamline the installation process on site and avoid costly miscalculations.

Taking into account the complexities of the MEP (M&E) systems industry, BIM-driven prefabrication and modularisation has led to multifaceted benefits: reduced rework, in-time project completion, cost savings and increased efficiency.

·      Government Intervention 

Another critical development from outside the industry is the government policies in different parts of the world either promoting or mandating the use of BIM in varying levels for government-funded or private projects. In the US, the General Services Administration (GSA), through its Public Buildings Service (PBS) Office of Chief Architect (OCA), established the National 3D-4D-BIM Program in 2003. GSA mandated the use of spatial program BIMs as the minimum requirements for submission to OCA for Final Concept approvals of all major projects receiving design funding in 2007 and beyond.

In Europe, the UK Government has made Level 2 BIM compulsory for all publicly-funded projects from 2016 onwards with a view to trim the cost of public-funded projects and to reduce carbon emission to meet its EU commitments. Government agencies from the Scandinavian nations have played an important role. Senate Properties, Finland’s state property services agency, required the use of BIM for its projects since 2007. Neighbouring Norway and Denmark have also made sufficient headway towards adopting BIM practises in their public-funded projects. Statsbygg, the Norwegian government agency that manages public properties, including heritage sites, campuses, office buildings and other buildings, employed BIM in all its projects by 2010.

In Asia, Singapore was in the forefront of driving the adoption of BIM. After implementing the world’s first BIM electronic submission (e-submission) system for building approvals, the Building and Construction Authority (BCA) mapped the BIM Roadmap with the aim to adopt BIM for 80% of construction projects by 2015. In Hong Kong, the Housing Authority (HA) not only developed a set of modelling standards and guidelines for BIM implementation but also stated its intent to apply BIM to all its new projects by 2014-15. South Korea’s Public Procurement Service, which reviews designs of construction projects and provides construction management services for public institutions, has made BIM mandatory for all projects worth more than S$50 million and for all public sector projects by 2016.

Monday, 13 January 2014

3D MEP Coordination: An Effective Way to Reduce Rework and Increase Efficiency

As the architecture, engineering and construction (AEC) industry faces tremendous pressure to deliver optimal projects within stringent deadlines, improving process efficiency and reducing rework is certainly the need of the hour. The design and construction-related rework is one of the critical factors that adversely affect productivity, profitability and timely completion of projects for both contractors and owners. Besides, it impacts designers, subcontractors, MEP (M&E) engineers, consultants and the entire downstream chain. In comparatively larger and more complex projects, the design-build rework can negatively influence the entire project workflow, delay project delivery, and cost more than what was originally estimated.

As mechanical, electrical, and plumbing systems account for a significant value of the project, the prudent use of building information modeling (BIM) tools to effectively coordinate MEP (M&E) systems helps reduce rework and increase productivity. On the other hand, the lack of well-planned interdisciplinary MEP (M&E) coordination results in duplication of efforts, major interferences and design clashes on site, as well as fabrication changes and errors.

Since BIM requires comprehensive pre-construction planning and multidisciplinary coordination, its adoption by the MEP (M&E) team increases technical interoperability among various members during building services coordination. In BIM-led MEP (M&E) coordination, building services designers, consultants, and subcontractors are involved during the design and planning stage. One of the most crucial factors for an effective and accurate coordination exercise is to decide on a specific protocol for creating virtual architectural, structural, mechanical, electrical, plumbing and fire protection models of the same facility. Subsequently, the team should agree on mechanisms to merge the models from different trades and create a combined coordinated services MEP model.

For instance, the designers use Revit Architecture application to prepare architectural BIM models that accurately represent elements, such as walls, doors, windows, ceilings, and casework. Furthermore, each of these elements has a range of parameters, including thickness, height, materials, and texture, among others. Using this architectural model as a reference point, a structural model will be created using Revit Structure which features vertical and horizontal structural framing, foundations, and slabs.

Subsequently, the MEP (M&E) contractors and subcontractors design separate models for mechanical, electrical, and plumbing systems using 3D MEP modeling software (such as Autodesk MEP and Revit MEP). Usually, the mechanical models include HVAC ducts, piping assemblies, hangers, diffusers, and pipe insulation, to name a few. The electrical models will represent details concerning conduits (feeder and underground), junction boxes, lighting systems, cable/wire bundles, and cable trays, amongst others. The plumbing system model includes storm and sewage lines, plumbing assemblies, hot/cold water piping, and other specialty equipment.

Once the respective architectural, structural, and building services models are in place, they have to be merged and taken into a clash detection application and specialist interference-checking application, such as Autodesk Navisworks. Any clashes and inconsistencies, including the geometry-related hard clashes, the clearance clashes, and workflow clashes are detected. Post clash detection, the combined services models and drawing sets have to be prepared to show how MEP (M&E) systems fit together in the same space.

As a result, the MEP (M&E) installers and fabricators receive well-coordinated and clash-free building services drawings on site, which drastically reduces the number of installation conflicts in the field. Additionally, MEP (M&E) BIM coordination leads to a greater number of assemblies being prefabricated off-site in a controlled factory environment, which in turn improves the logistical flow on site. Moreover, another positive outcome of BIM-driven MEP (M&E) coordination exercise is relatively lesser number of change orders and RFIs (request for information).

All the above positive effects of MEP (M&E) BIM coordination make the design-build process more efficient by increasing project’s schedule compliance whilst reducing design and construction-related rework.

Wednesday, 16 October 2013

Benefits of BIM Services for Pre-Construction Planning are Multifaceted and Long-Term

In the AEC industry, the advent of building information modeling (BIM) concept was viewed by many as an evolution to better 2D and 3D computer-aided design (CAD) techniques. Very few saw it as an interdisciplinary, collaborative tool that would drastically change the design-build project workflow, the management structure of AEC firms, the teaming models, the delivery standards, and the role of key disciplines involved.

As opposed to the vertical communication channels and delivery methods required by the traditional design-build approaches which mainly employ CAD, BIM necessitates an open and integrated horizontal collaboration channel between all the key stakeholders of the project: facility owners, designers/architects, MEP (M&E) engineers, consultants and contractors. To realise the benefits of employing BIM services as compared to 3D CAD modelling tools, firms need to significantly invest in knowledge/skills development, personnel training, management restructuring, and software tools. However, more than these tangible investments, AEC companies need a complete change in mindset in case they want to adopt BIM for their projects.

Whilst many professionals, especially those from small and medium-sized firms, see it as an extension of 3D CAD, BIM is anything but 3D CAD. BIM services involve extensive pre-construction planning and multidisciplinary coordination to virtually model building facilities using smart parametric objects embedded with rich accurate information. This intelligent model then can be used by all stakeholders to extract respective views and relevant information thereby resulting in timely decision-making and project delivery.

Though BIM and 3D CAD are not mutually exclusive to each other, they have major differences as far as the approach and the output is concerned. In traditional 3D CAD, depending on the scope of project, architects prepare a set of construction drawings, including the plans, sections, and elevations. Since all these views are independent entities, any change in one view has to be manually updated in others. As a result, the process is not only time-consuming but also increases the scope for errors.

On the contrary, a building information model contains the architectural, structural and MEP system models of the proposed facility. It is prepared during the design and planning stage using details from all the key stakeholders including designers, engineers, MEP contractors, and subcontractors. Since a single database-driven model represents details required by all disciplines, any changes made by any of the team members are automatically updated across the model to plans, sections and elevations. Hence, all the project team members are updated on all the changes made by others thereby saving time, reducing cost resulting from duplication of efforts, and increasing the overall quality of construction drawing sets. As a result, making small changes to the architectural plan would result in those changes appearing simultaneously in the section, elevation or schedule for the same change to the plan.

Furthermore, the building blocks of 3D CAD models are lines, circles, arcs, and other graphical entities, which lack the flexibility of data analysis. These models only serve as geometric objects devoid of detailed parameters which are required by the entire AEC supply chain. In contrast, BIM models comprise building elements and intelligent systems, including columns, beams, and walls, which contain rich data related to parameters. If needed, additional parameters can be added to the pre-existing ones for more detail. And, this rich data can be effectively shared across disciplines for rich collaboration and on-time delivery.

Nevertheless, the success of any project which employs BIM depends mainly on factors which include the richness of information embedded in the 3D models, the degree of openness in the interdisciplinary data-sharing and collaboration standards, and the level of mutual trust among all the professionals involved. If prudently planned and implemented, a BIM model not only represents the essential building elements in detail; valuable information concerning spatial coordination, geographic location, quantity take-offs, material requirements, time schedule, and project cost can be extracted when needed.

In essence, well-planned BIM services help accurately represent the entire project design lifecycle. Though preparing for and implementing BIM strategies requires considerable investment of time, money, and effort, its benefits are multi-faceted and long-term. Employing BIM modelling can not only help in more effective design and construction but also offers pre-fabrication and facilities management advantages.